| Sign In | Join Free | My xxjcy.com |
|
MOQ : 250 square meters
Delivery Time : 45days
Installation : Engineers Guidance
Payment Terms : L/C,T/T
Material : Q355B / Q235B High Strength Structural Steel
Maximum Wind Resistance (mph) : 81-120mph(130.36-193.12km/h)
Construction drawing design : SAP2000 /AutoCAD /PKPM /3D3S/TEKLA
Model Number : RS-11061421
Price : USD 55~68 square meters
Main frame : Welded/ Hot-rolled H-section Steel, Square Tube Etc
Certification : CE,SGS
Place of Origin : FUJIAN,CHINA
Supply Ability : 20000 square meters per month
Product name : Prefab own brand steel workshop
Brand Name : QZ RIDGE
Packaging Details : naked
What Is a Prefabricated Steel Structure Building?
A prefabricated steel structure building is a bolt-together steel frame system in which every column, rafter, purlin, and connection plate is precision-cut, drilled, and welded in our factory — then containerized and shipped to your site for rapid assembly.
Key Features
1. Full Code Compliance — Wherever You Build
· We don't ship a "generic" building and hope it passes. Every structure is engineered to your specific location's requirements:
|
Standard |
Application Region |
|
EN 1090-2 EXC2/EXC3 |
Europe, UK, Middle East |
|
UKCA / CE Marking |
United Kingdom, European Union |
|
NBCC + CSA S16 |
Canada |
|
AISC 360 / ASCE 7 |
United States, Caribbean |
|
AS/NZS 1170 |
Australia, New Zealand, Pacific Islands |
|
SANS 10160 / SANS 10162 |
South Africa, Sub-Saharan Africa |
· What you get: A full documentation package — structural calculations, material certificates, weld procedure specifications (WPS), NDT reports, and declaration of performance (DoP) where required.
2. Bolt-Together System — No Site Welding
· Every connection in our steel frames is designed for bolted assembly. Your crew needs:
· A mobile crane or telehandler
· Basic hand tools and torque wrenches
· Our color-coded erection drawing set
· No welding machines. No on-site NDT. No weather delays waiting for weld inspections.
Project Location: Lanseria Airport, Gauteng Province, South Africa Project Type: Complex integrating aircraft hangar, aviation‑material exhibition hall and office area Building Area: 3,600 m² (2,400 m² for hangar + 1,200 m² for exhibition hall & offices) Delivery Lead Time: 55‑day design + 50‑day production + 70‑day sea freight & on‑site erection
Frequently Asked Questions
· How long does it take from order to delivery?
· Typical timeline: design & engineering 15–25 working days + fabrication 25–50 working days + ocean freight (varies by destination; e.g., 22 days to West Africa, 30 days to Europe, 35 days to East Coast North America). Most projects arrive on site within 10–14 weeks of order confirmation.
· Can you handle the structural design and calculations?
· Yes. Our in-house engineering team produces a complete structural package — frame analysis, connection design, foundation reaction tables, and anchor bolt layouts — referenced to your local building code. We can also coordinate with your local engineer of record for plan review and permit submission.


|
|
Premium Prefabricated Steel Warehouse for Logistics Companies - Fast Installation & Cost-Effective Building Solution. Images |